VehiclesKyosho TF7Shock service
Maintenance reference
Shock service
Kyosho TF7 · 30026
30026 TF7 original assembly kit
← Vehicle service referenceStart with the correct reference
Use the exact shock piston and cartridge drawing.450cSt is the recommended starting setup, not a measured factory fill.
- Shock assembly and oil bleeding, PDF p. 19 (opens in a new tab)
Assembly drawing · 30026 exact manufacturer-linked 30026 T01
An assembly drawing shows the components; it does not provide a complete service sequence. - Shock installation, PDF p. 20 (opens in a new tab)
Assembly drawing · 30026 exact manufacturer-linked 30026 T01
An assembly drawing shows the components; it does not provide a complete service sequence.
Parts, tools and consumables
Listed in the reference
- Silicone shock oil 450cStconsumable
Original shock assembly starting setup
Requirement source, PDF p. 19 (opens in a new tab)
Part links open an exact-model OEM listing. Quantities, reused hardware and condition-dependent replacements may need checking in the manual. A listed part is not an instruction to replace it.